Load Limits for Emergency & Emergency Preparedness Vehicles whilst scaffolding is installed for the 30m length spans of the Phillip Island / San Remo Bridge from 26 February to late June 2024 and late September to late December 2024. Exact dates will be provided at 3 weeks’ notice in June and September 2024.

Emergency & Emergency Preparedness Vehicles

Mapped Network NameExisting Mapped Status Mapped Status during works Note for applicable operator(s);
Advice on how to seek access during the works
Emergency Response & Preparation Combinations (up to 46.0t & 3.0m wide)
Approved Conditionally
Approved
Conditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions.
Emergency Response & Preparation Combinations (up to 78.5t & 4.0m wide)ApprovedConditionally ApprovedConditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions.
Unimog 4000M Fire TrucksApproved ApprovedNo operational impact