Load Limits for Class 1 Heavy Vehicles whilst scaffolding is installed for the 30m length spans of the Phillip Island / San Remo Bridge from 26 February to late June 2024 and late September to late December 2024. Exact dates will be provided at 3 weeks’ notice in June and September 2024.

Class 1 Vehicles

Mapped Network NameExisting Mapped Status Mapped Status during works Note for applicable operator(s);
Advice on how to seek access during the works
2-Axle SPVs, & 2-Axle Humma Pick & Carry Crane NetworkApproved ApprovedNo operational impact
40t SPVs (3 & 4-Axle Truck Cranes & Concrete Pump Trucks)ApprovedApprovedNo operational impact
4 & 5 Axle All Terrain Mobile CranesConditionally ApprovedConditionally ApprovedConditional access. Crane must be reduced to below 42.5 tonnes with removal of counterweights.
6 to 9 Axle All Terrain Mobile Cranes (Reference Vehicles 1 to 8)Not MappedNot MappedExisting permits shall be rescinded. Re-application for access during the period of works required.
Platform Trailer and Low Loader Networks (Reference Vehicle 1 to 23)Not MappedNot MappedExisting permits shall be rescinded. Re-application for access during the period of works required.
59.5t and 77t Low Loader NetworksNot MappedConditionally Approved Conditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions.
Oversize & Over Mass (OSOM)Not MappedConditionally Approved Conditional access. Vehicles at or below 42.5 tonnes GCM will be approved for access via map. Permits, obtained from the NHVR, will be required for access above 42.5 tonnes, to be considered on a case-by-case basis, dependent on time of day and traffic management conditions.